Get high volumetric efficiency & low energy consumption products to suit your needs
Supervac 18000
18000 m3/hr Nominal Displacement (50/60 Hz)
0.005 Torr Ultimate Vacuum
52 KW Power (Connected)
350 mmNB Port Size Suction
3 NO. OF STAGES
VACUUM CALCULATOR
Choose Your Industry
UNIVERSAL GAS CONSTANT
g/mol
INLET TEMPERATURE OF VAPOURS INTO VACUUM PUMP
FOR >50 degree celsius- The vapours will enter into the
vacuum pump/system after passing through condenser
&Everest anticipates that there is sufficient Heat
Transfer in the condenser/heat exchanger, thereby
reducing the Inlet Vapour Temperature.
deg. Kelvin
BLANK-OFF VACUUM REQUIRED
(at closed suction)
Torr
VACUUM REQUIRED IN THE PROCESS
(under working condition)
Everest wishes to inform you that in process of
Distillation/ Drying, initially the Vapour Load is high &
vacuum achieved is low & as the vapour load reduces
the vacuum level keeps improving Finally coming down
to Required High Vacuum Level.
Torr
SYSTEM VOLUME
This comprises of the Volume of the Reactor/
Distillation Column/ Dryer, Heat Exchagers/
Condensers, Receivers/ Traps & Process Piping upto the
vacuum Pump/ Systems
Cubic Meter
NON-CONDENSABLE LOADS
The NC Loads means the Air Leakage Load in the entire
process. This can be measured either by Pressure Rise
Test for existing vessels OR by HEI Chart for New
Installations.
kg/hr
MOLECULAR WEIGHT OF AIR
g/mol
CARRY OVER VAPOUR LOADS
These are defined by calculating loss of vapours from
the Process. This is Basically the Vapour that gets
carried over without getting condensed in the Process
condenser.
Can also be calculated by Loss of Vapours divided by
the number of batch hours.
SOLVENT NAME :
kg/hr
MOLECULAR WEIGHT
g/mol
SOLVENT NAME :
kg/hr
MOLECULAR WEIGHT
g/mol
NUMBER OF PRE-CONDENSERS
Unit
UTILITY IN THE PRE-CONDENSERS
(Depending upon the Units filled above)
TYPE
IN TEMP.
OUT TEMP
PRIMARY
SECONDARY
TERTIARY
DISTANCE OF VACUUM SYSTEM FROM PROCESS CONDENSER
Meter
BATCH TIME
Hours
Everest vacuum system shall be supplied in the form of Skid Mounted, Ready to Run Unit with all required accessories in terms of :
Electrical: Motors, VFD's, Switchgears, Relays, Logic, MCB, Electric Panel, Remote Pendant etc.
Instrumentation: PLC, Solenoid, Temperature controllers. Vacuum Controllers, Gauges, SKADA/ DCS COntrolling etc.
Hardware: Skid Structure, Interconnecting Piping, Bellows, Flanges, Coupling, Coupling Guards, Valves, Strainers, Filters, Condensers, Heat
Exchangers etc.
All speciefied components can be incorporated depending upon the customer requirement.
Enter Email ID :
Our Spring Sale Has Started
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/